Building Stages

Stage 1 Preliminary Stage…

  • Choosing and customizing house plans
  • Fixed price contract & specification
  • Building permit
  • Color selection

Stage 2 Base Stage…

  • Set out and scrape site
  • Under Slab drains laid and concrete slab poured
  • Power connected

Stage 3 Frame Stage…

  • Frame erected and roof trusses installed
  • Windows installed
  • Onsite meeting with Sales Consultant and Supervisor

Stage 4 Lock Up Stage…

  • Frame wrap up, site clean
  • Exterior Doors
  • Onsite meeting with Sales Consultant and Supervisor
  • Roof and brickwork completed

Stage 5 Fixing Stage…

  • Plaster lining installed along with kitchen and vanities
  • Plumbing & heating/Cooling being installed
  • Electrical rough in / All Rough Ins

Stage 6 Completion Stage…

  • All electric, plumbing and heating fitted off
  • Shower screens, mirrors, splash backs, doors, robe rails to be installed & painting to be complete
  • Floor & wall tiling.
  • Driveways, footpaths and landscaping
  • Gas/Phone connection and builders final clean

Stage 7 Handover Stage…

  • Completion inspection of your new home
  • Handover to client by Sales Representative

Stage 8 After Completion…

  • Inspection is carried out 3 months from completion date
  • Any subsequent works from the inspection will be carried out as agreed with the Supervisor